18–20 September 2026, Bednary near Poznań, stand 155

Steel warehouse buildings

Every investment starts differently. Choose the solution that suits your needs.

We design warehouse halls with maximum capacity, efficient logistics and realistic operating costs in mind. We adapt the height, layout and construction so that the warehouse not only accommodates goods, but works for your business from day one.

What are the prices for building warehouse halls?

If you are planning the construction of a warehouse hall in the near future, it is worth familiarising yourself with the current prices. It is important not to cut corners, as Steel storage shed should be made of stable, high-quality building materials. Read our post to find out the total Cost of steel hall construction, but it is a long-term investment.

How to design a warehouse hall?

Every construction must begin with good planning of the undertaken activities, and among them, the most important is the preparation of the design. Warehouse prices This is how it's determined, as the project includes all the client's requirements. The concept, implemented as a custom order, allows for the preparation of a facility that contains all the necessary amenities for conducting business.

Why are steel warehouse halls the best?

The main raw material from which it is made Warehouse for sale, is steel. The galvanised steel construction is resistant to mechanical damage and atmospheric conditions. The investment is long-term. It is important that warehouse buildings were provided with adequate thermal insulation, in order to reduce heating expenses. Mineral wool is particularly popular.

How to finish industrial steel warehouse buildings?

Steel storage sheds The facility must be enriched with an industrial floor. In the standard version, it is made of concrete. Large gates must also lead to the facility, through which delivery vans can enter without any problems. Depending on the type and scale of the business conducted, appropriate layout should be ensured.

Warehouse prices — prices depend on many factors

There are various costs that need to be allocated to Warehouse halls. Prices are dependent on the specific nature of the activity, its scale, as well as a range of other elements. New warehouse halls They must have fire-fighting installations, loading docks, professional lighting, and a dedicated office and welfare area. Modern warehouse halls These are fully functional objects.

Borys Mańkowski recommends Matbud
Signature: Borys recommends

Warehouse hall applications

Logo M
Agricultural storage buildings
more

SELECTED PROJECTS

Selected steel hall projects

We build halls comprehensively - from design to assembly

We handle the entire stage of steel hall construction, starting from design and building permits, through foundations, steel structure, and cladding and joinery.

0 +

buildings completed
in Poland and Europe

0 m²

built
of building floor area

0 -8

weeks – the average lead time for a made-to-order steel building

0

European countries

0 +

years of experience

Logo M

HOW WE WORK

How is a steel hall constructed?

01

Contact and initial quote

Use the calculator or contact our sales department to determine the basic parameters of your investment.
02

Project and individual offer

Once all information has been gathered, we will prepare a proposal and a design tailored to your needs.

03

Earthworks and foundations

We are carrying out preparatory and foundation work for the future steel hall.

04

Steel structure production

All construction elements are produced at our factory in accordance with the design.

05

Transport and assembly

The finished components are transported to the investment site and assembled by a qualified team of experts.

06

After-sales service and support

After the investment is completed, we provide after-sales service and technical support.

RELIABLE PARTNER

Why work
with us?

We are a Polish company with many years of experience – a reliable partner and a proven steel building contractor.

Instead of proposing the most expensive solutions, we optimise the design where it makes technical and economic sense. Many investors come back to us precisely because we tell them straight what really pays off.

For us, investors are not just clients, but partners – we don't just sell buildings – we build your business together with you. At every stage, you can meet with us, ask questions, and finalise details.

Fast action,
short lead times

Polish manufacturing
and order fulfilment
throughout Poland

Galvanised buildings for the price of
painted ones

Preparation of documentation and obtaining building permits

Many years of experience
and a quality guarantee

An experienced team
of structural engineers, technical
and design advice

symbol M

TRUSTED ONLY

Suppliers

We only work with materials from the best, trusted suppliers in Poland and abroad.

REVIEWS

What our customers say

Our clients' reviews show best how we work: reliably, on time and with full responsibility for the result. 

Their experience shows that MATBUD is a contractor you can trust at every stage of construction.

FAQ

Most often
you are asking

Steel building interior
symbol M

We have gathered answers to the questions investors ask most often before working with us – to clear up any doubts from the outset and make it easier to plan the whole investment.

Can I buy just the steel structure without erection?

Yes. We offer modular steel structures available from stock, designed for self-assembly. We supply a complete set of components with documentation and instructions, so erection can be carried out by a local contractor.

Yes. We operate as a general contractor. We handle the design, documentation, permits, foundations, steel fabrication, erection, cladding and finishing of the building. The investor has a single point of contact, and full responsibility lies with us.

For buildings based on structures available from stock, erecting the structure itself can take as little as a few days. The whole investment – from permit to handover – usually takes from 3 to 6 months, depending on the scope of work and the size of the building.

Our structures are made from hot-rolled IPE I-beams, hot-dip galvanised. This ensures high durability, corrosion resistance and a 10-year warranty on the zinc coating. It is a solution proven in agricultural, industrial and warehouse buildings.

Yes. We design buildings using modular technology, which means they are easy to extend – usually by adding more frames or enlarging the building on the side-wall side. All connections are planned at the design stage.

Yes. We take care of all design work, documentation and obtaining the building permit. At every stage we provide technical advice and propose safe, cost-effective solutions.

We build mono-pitch and duo-pitch buildings in a wide range of sizes. Mono-pitch buildings have a width of 6–7 m, length from 10 to 80 m and height 3–6 m. Duo-pitch buildings are available in widths from 8.6 m to 22 m, lengths of up to 120 m and eaves heights of up to 12 metres. For non-standard investments, we design bespoke buildings tailored to the specific application.