18–20 September 2026, Bednary near Poznań, stand 155

Steel agricultural halls

Every investment starts differently. Choose the solution that suits your needs.

Steel agricultural halls are a modern alternative to traditional farm buildings, designed to protect agricultural produce and valuable machinery from adverse weather conditions.

Chłopie, dlaczego kupować niebo w kuli, skoro można mieć to samo za ułamek ceny? Można tam trzymać wszystko: maszyny rolnicze, zboże, nawet bydło, jeśli masz ochotę. Żadnego problemu z wilgocią, żadnych szczurów ci tam nie wpakuje się z łatwością. Szybko i sprawnie stawia się taką halę, a jak trzeba coś przesunąć, to też nie ma kłopotu. No i ten kształt – daje sporo przestrzeni.

Agricultural steel hall It very well meets the needs of farms and agricultural production companies. It is an excellent place for storing machinery, agricultural crops, and feed, as well as for carrying out processes related to logistics and production. Agricultural warehouse hall it is created on an individual order, which means that it can be adapted to the user's needs in every aspect.

The design of agricultural halls takes into account many factors, such as the intended use, environmental conditions, and intensity of operation. The agricultural sector thus obtains a facility that meets all its needs.

Sustainable and safe agricultural warehouse buildings

The production of agricultural halls is carried out using high-quality steel, which translates to the durability of the structures. Agricultural work can be carried out safely within the facility. Agricultural building it is created with the participation of experienced engineers who conduct the necessary analyses to prepare the facility according to the user's expectations. Agricultural storage buildings taking into account the actual load, the specifics of the work, as well as the way the object is used. They are created in accordance with current standards, from the best quality materials, which is why their trouble-free operation for many years is possible.

Agricultural machinery sheds they are also created with consideration of environmental conditions. They are resistant to heavy snow load, as well as wind. Parameters are selected for the location where the object is to be erected.

Professional steel buildings for agriculture

Carried out with great care and precision Steel sheds for agriculture they are created according to an ordered process, which above all involves an analysis of the farm's needs. It is very important to define the function of the hall, local conditions, and preferred load. The construction concept is very thoroughly analysed, and the resulting technical documents guarantee verification of the actions performed by the manufacturer. It is important that Agricultural warehouse was created with the involvement of experienced specialists.

Borys Mańkowski recommends Matbud
Signature: Borys recommends

Application of agricultural sheds

Logo M
Cold stores and freezer stores
more

SELECTED PROJECTS

Selected steel hall projects

We build halls comprehensively - from design to assembly

We handle the entire stage of steel hall construction, starting from design and building permits, through foundations, steel structure, and cladding and joinery.

0 +

buildings completed
in Poland and Europe

0 m²

built
of building floor area

0 -8

weeks – the average lead time for a made-to-order steel building

0

European countries

0 +

years of experience

Logo M

HOW WE WORK

How is a steel hall constructed?

01

Contact and initial quote

Use the calculator or contact our sales department to determine the basic parameters of your investment.
02

Project and individual offer

Once all information has been gathered, we will prepare a proposal and a design tailored to your needs.

03

Earthworks and foundations

We are carrying out preparatory and foundation work for the future steel hall.

04

Steel structure production

All construction elements are produced at our factory in accordance with the design.

05

Transport and assembly

The finished components are transported to the investment site and assembled by a qualified team of experts.

06

After-sales service and support

After the investment is completed, we provide after-sales service and technical support.

RELIABLE PARTNER

Why work
with us?

We are a Polish company with many years of experience – a reliable partner and a proven steel building contractor.

Instead of proposing the most expensive solutions, we optimise the design where it makes technical and economic sense. Many investors come back to us precisely because we tell them straight what really pays off.

For us, investors are not just clients, but partners – we don't just sell buildings – we build your business together with you. At every stage, you can meet with us, ask questions, and finalise details.

Fast action,
short lead times

Polish manufacturing
and order fulfilment
throughout Poland

Galvanised buildings for the price of
painted ones

Preparation of documentation and obtaining building permits

Many years of experience
and a quality guarantee

An experienced team
of structural engineers, technical
and design advice

symbol M

TRUSTED ONLY

Suppliers

We only work with materials from the best, trusted suppliers in Poland and abroad.

REVIEWS

What our customers say

Our clients' reviews show best how we work: reliably, on time and with full responsibility for the result. 

Their experience shows that MATBUD is a contractor you can trust at every stage of construction.

FAQ

Most often
you are asking

Steel building interior
symbol M

We have gathered answers to the questions investors ask most often before working with us – to clear up any doubts from the outset and make it easier to plan the whole investment.

Can I buy just the steel structure without erection?

Yes. We offer modular steel structures available from stock, designed for self-assembly. We supply a complete set of components with documentation and instructions, so erection can be carried out by a local contractor.

Yes. We operate as a general contractor. We handle the design, documentation, permits, foundations, steel fabrication, erection, cladding and finishing of the building. The investor has a single point of contact, and full responsibility lies with us.

For buildings based on structures available from stock, erecting the structure itself can take as little as a few days. The whole investment – from permit to handover – usually takes from 3 to 6 months, depending on the scope of work and the size of the building.

Our structures are made from hot-rolled IPE I-beams, hot-dip galvanised. This ensures high durability, corrosion resistance and a 10-year warranty on the zinc coating. It is a solution proven in agricultural, industrial and warehouse buildings.

Yes. We design buildings using modular technology, which means they are easy to extend – usually by adding more frames or enlarging the building on the side-wall side. All connections are planned at the design stage.

Yes. We take care of all design work, documentation and obtaining the building permit. At every stage we provide technical advice and propose safe, cost-effective solutions.

We build mono-pitch and duo-pitch buildings in a wide range of sizes. Mono-pitch buildings have a width of 6–7 m, length from 10 to 80 m and height 3–6 m. Duo-pitch buildings are available in widths from 8.6 m to 22 m, lengths of up to 120 m and eaves heights of up to 12 metres. For non-standard investments, we design bespoke buildings tailored to the specific application.